Case Study: Gunnislake Station
At Gunnislake station, Cornwall there was an obstruction under the main rail tracks in the station. Jetclean UK used a remote controlled cutter to grind away at the concrete obstruction. Jetclean UK installed a patch repair over the broken pipe. The train moved with no delays while the project was undertaken.
Pre Survey
Patch Cutting
Post Cutting Survey
Post Repair Survey
Lateral cutting after re-lining can be done from 100mm pipes up to 600mm pipes.
This method used to be resolved by digging holes, the cutter saves time, money and disruption.
Intruding connections, which obstruct the flows in the sewer pipe, can be cut off flush with the existing pipe using the same robotic cutter.